FLOODPLAIN DEVELOPMENT PERMIT

A Floodplain Development Permit may be required for development within a designated floodplain.

AGENCY: Local City or County Floodplain Administrator

  • BEFORE YOU START:

    See what information, photos, plans and project details may be helpful to have ready. You can start your application and return anytime.


    Prepare Before You Apply →

  • 1. COMPLETE THE JOINT APPLICATION FORM IN GILLY

    Create an account and begin your application.

    Gilly guides you through the project information and any additional questions required for the permit.

  • 2. DOWNLOAD & SUBMIT TO YOUR LOCAL FLOODPLAIN ADMINISTRATOR

    Before submitting, contact your local Floodplain Administrator. Requirements vary by community, and additional information or engineering may be required.

    Download your completed Joint Application Form from Gilly and submit it to the city or county Floodplain Administrator for your project location.

    Floodplain Development Permit applications are not submitted through Gilly.

    Find Your Local Floodplain Administrator →

FLOODPLAIN DEVELOPMENT PROJECT EXAMPLES MAY INCLUDE:

  • BUILDINGS & PROPERTY DEVELOPMENT

    • New buildings

    • Additions or other structures

    • Wells or septic systems

    • Fill placed within the floodplain

  • ROADS & ACCESS

    • Roads

    • Driveways

    • Culverts

    • Bridges

  • WATER & SITE IMPROVEMENTS

    • Ponds

    • Drainage features

    • Other improvements within the floodplain

  • FILL & GRADING

    • Placement of fill

    • Excavation or grading associated with development

SOME PROJECTS MAY REQUIRE ENGINEERING

Certain projects may require a licensed Montana engineer to address whether the project can withstand a 100-year flood, avoid adverse effects on surrounding properties and determine its effect on the 100-year base flood elevation.