SECTION 404 / 10 PERMITS

Section 404 and Section 10 permits may be required for projects involving dredged or fill material in streams or wetlands, or structures and other work in certain state-designated navigable waters.

AGENCY: U.S. Army Corps of Engineers (USACE)

  • WHO NEEDS A SECTION 404 / 10 PERMIT?

    Section 404 may apply to projects involving the discharge or placement of dredged or fill material into waters of the United States, including streams and wetlands.

    Section 10 may apply to structures or other work in, over, under or affecting federally navigable waters.

    The U.S. Army Corps of Engineers determines whether a permit is required and what type of authorization applies.

    See Examples of Section 404 / 10 Projects →

HOW TO APPLY FOR SECTION 404 / 10 PERMITS

  • BEFORE YOU START:

    Gilly helps you work through the application step by step. Having your project information, photos, plans and supporting materials ready can make the process easier, but you can start now, save your progress and return anytime.


    Prepare Before You Apply →

  • 1. COMPLETE THE JOINT APPLICATION FORM IN GILLY

    Create an account and begin your application.

    Gilly guides you through the project information and any additional questions required for the permit.

  • 2. DOWNLOAD & SUBMIT TO THE U.S. ARMY CORPS OF ENGINEERS

    Download your completed Joint Application Form from Gilly and submit it directly to the U.S. Army Corps of Engineers with construction plans or sketches, if available.

    Section 404 and Section 10 applications are not submitted through Gilly.

    Contact the Montana Regulatory Office →

ADDITIONAL INFORMATION FOR SECTION 404 / 10

Section 404 / 10 applications may require additional information about aquatic resources, project impacts, fill material and the ordinary high-water mark. Gilly guides you through these questions.

SECTION 404 / 10 PROJECT EXAMPLES MAY INCLUDE:

  • STREAM & BANK PROJECTS

    • Bank stabilization involving fill

    • Culverts and stream crossings

    • Other placement of fill below the ordinary high-water mark

  • WETLAND PROJECTS

    • Placement of soil, rock or other fill

    • Excavation or grading involving dredged or fill material

    • Other projects affecting regulated wetlands

  • NAVIGABLE WATER PROJECTS

    • Docks and other structures

    • Utility crossings

    • Excavation, placement of material or other work affecting navigable waters